The end customer did not have much knowledge about ball mill costs, so they hired an engineer with 45 years of experience in the crushing and grinding industry and contacted 8 different manufacturers to request designs and quotations. After 20 rounds of technical detail analysis and 6 rounds of price negotiation, the end user ultimately chose our complete MR ball mill production line.

Project Information

Raw Material: Feldspar

Feeding Size: 200mm

Output Size: 200 Mesh, 325 Mesh

Production Capacity: 3-5t/h

Passing Rate: 98%

Mill Model: 1830*7000

Location: Latin America

Problems & Solutions

( 1 )Iron Contamination!
The customer wants to grind sodium feldspar into 325 mesh powder for use as ceramic glaze and glass batch component. Sodium feldspar is used in ceramics and glass to introduce sodium oxide and aluminum oxide, but iron (Fe₂O₃) is a harmful impurity that can cause yellowish, grayish, or black spots in the final product. The customer is extremely concerned that the ball mill (especially the grinding media and internal lining) will introduce iron contamination during the grinding process.

3-5tph Molino de Bolas para Moler Feldespato-Usos de los productos terminados

Our recommendation to the customer is as follows:
Use wear-resistant ceramic liners and grinding media instead of manganese steel liners and steel balls, thereby avoiding iron contamination.

( 2 )Is the fineness of the finished product adjustable?
The customer wants to produce 200 mesh and 325 mesh powder, and is concerned whether the fineness of the finished product is adjustable.
We have recommended the VX series ultrafine powder separator to the client, equipped with a frequency converter. This frequency converter allows the operating speed of the separator to be adjusted, thereby controlling the fineness of the finished powder. The higher the speed of the separator, the finer the powder; the lower the speed, the coarser the powder.
Different levels of grinding fineness can also be achieved by adjusting the grading of the ceramic balls.

Equipment Delivery

MR has a strict shipping management system. For example:
( 1 )Scientific loading inside the container

        ⇒A container distribution plan is designed based on the weight and dimensions of the goods, ensuring a stable center of gravity and preventing movement during transport.
        ⇒Heavy-duty straps and wooden structures are used to secure large equipment, while small parts boxes are used to fill empty spaces and prevent vibration.

3-5tph Molino de Bolas para Moler Feldespato-Foto de fijación

          ⇒Se adhieren etiquetas en las paredes internas del contenedor, como “Posición del centro de gravedad” y “No voltear”.

3-5tph Molino de Bolas para Moler Feldespato-Señalización de contenedores

( 2 )Dual management of internal and external labels.
         ⇒Each packing box has a waterproof label on the outside, which includes: project name, customer code, schematic diagram of the contents, part number, and gross/net weight.
         ⇒A master packing list is prepared, detailing the contents corresponding to each box number, and includes photos and videos of the loading process (especially before sealing the container).

3-5tph Molino de Bolas para Moler Feldespato-Entrega de Equipos

After-Sales Service

MR engineers travel to the client’s site to provide guidance, installation, and commissioning services. Special attention is given to the following two points:
Full-process inspection record: Data from each installation step (such as leveling, clearance values) must be retained to facilitate traceability.

Pre-assembly verification: Large components (such as the cylinder body, gear cover) must be pre-assembled on the ground first to confirm interface compatibility before lifting.

Follow thermal deformation principles: In environments with large temperature variations, avoid precision measurements during the hottest hours at noon to prevent errors caused by thermal expansion.

3-5tph Molino de Bolas para Moler Feldespato-Servicio de Postventa

Customer Feedback

The MR engineer not only helped the client install and commission the plant, but also adjusted it according to the different powder particle sizes the client needed to produce, and provided a new grading scheme for the ceramic balls, which was of great help to the client. The client was very satisfied with MR’s service.